Product managers

Cut 4–6 weeks from board bring-up using physics-driven AI that ensures first-pass success. Trusted by teams where prototype slippage means a missed product cycle.

Where Hardware PMs Lose Time

Product Managers in hardware R&D own the prototype schedule—but layout delays keep blindsiding their plans. A missed market window can cost the entire product cycle.

Missed prototype deadlines

Slip a schedule, miss a market window

Layout queues stretch 4–6 weeks

Testing and firmware teams are blocked from validating while waiting on layout

PMs stuck in status meetings

Chasing updates instead of advancing roadmaps

How Quilter Eliminates the Test Board Bottleneck

Quilter ensures your team discovers problems early—when there's still time to fix them. Quilter outputs first-pass-valid designs through physics-driven, constraint-bound automation.

What slows you down

How Quilter solves it

Measurable impact

Missed prototype deadlines

Physics-driven AI generates fully routed boards autonomously

Full design turnaround in <4 hours

Layout queues stretch 4–6 weeks

Scales layout capacity for rapid-turn validation boards—no waiting on layout resources

Cut board bring-up from 4–6 weeks to <1 day

Cross-team dependencies stall progress

Layout-ready output unblocks firmware and mech

Significantly accelerates sync across teams

PMs stuck in status meetings

Real-time routing progress, fabricator-ready outputs

Reduce status chasing by streamlining design reviews

What You Regain When Layout Isn't the Bottleneck

R&D Product Managers get their momentum back when layout moves at the speed of the rest of the team.

3x more design iterations per phase

Validate early, test faster, and hit more milestones without delay

90% faster layout

From schematic to board in under 4 hours

60% shorter time-to-validation

Keep firmware and test teams in flow

100% control retained

No surprises, no black box, fully constraint-driven

Designed to Fit Right Into Your Process—No Retraining Required

Quilter drops cleanly into existing EDA workflows—no disruption, no retraining.

Free Your Engineers to Focus on Innovation, Not Layout.

The fastest teams already made the switch—don’t be the last stuck hand-routing environmental test boards.